Griffco Valve Inc.
6010 N.Bailey Ave, Ste 1B
Amherst, NY 14226
Phone: 1 800-474-3326
Fax: 1 716-835-0893
GLASS CALIBRATION CYLINDERS
Operating Instructions:
Install the calibration cylinder in the suction linetothe chemical metering pump. Ensure that the cylinder is
vertical. Two (2)isolating ball valves must beinstall inthe suction line as per the drawing below.Thetop of the cylinder
should be vented back to the top of the chemical container ortodrain. A 12 lengthof flexable hose shouldbeinstall on
the top of the cylinder if it is to be hard piped into the system.
Thereare two (2) methods of using the calibration cylinder, measuring volume or rate of flow. Before starting the
calibration make sure the pump is primed.
Method 1 - Rate of Flow: (Using the USGPHscale)
Open isolatingvalves 1 and 2 to fillthecylinder
tothe top mark on the scale.(0 USGPH)
Close isolating valve (1) in the suction line.
Leaveisolating valve (2) open.
Switch on the chemical feed pump for 30
seconds. Switch off the pump.
The reading inthe right sideof the cylinder is a
direct readout in USGPH.
If the reading is not the desired rate of flow
adjust the pump volume and repeat the
process until the correctrate of flowis
achieved.
Method 2 Volumetric: (Using the mL Scale)
Open isolatingvalves 1 and 2 to fillthecylinder
tothe top mark on the scale.(0 mL )
Close isolating valve (1) in the suction line.
Leaveisolating valve (2) open.
Switch on the chemical feed pump for a
measured drawdown time.Shutoff thepump.
The volume displaced from the cylinder can be
readon the left side the cylinder scale in mL.
If the reading is not the desired rate of flow
adjust the pump volume and repeat the
process until the correctrate of flowis
achieved.
To convert toLPH or GPH use one of the
followtwo formulas
LPH= (volume÷drawdown time) x3.6
GPH = (volume÷drawdown time) x 0.952
Once the desired pump dosing volume has been set close isolating valve (2) and open isolation valve (1) to resume
normalpumping operation.
Note: Maximum sealed cylinder pressure is 15 feet of water column.
INJECTION
VALVE
DRAIN
VALVE
SHUT OFF VALVE
Y-STRAINER
ISOLATING BALL VALVES
OPTIONAL PRESSURE RELIEF PIPING
CHEMICAL
CONTAINER
GRIFFCO
CALIBRATION
CYLINDER
GRIFFCO PRESSURE
RELIEF VALVE
CHEMICAL
FEED PUMP
PULSATION
DAMPENER
GRIFFCO BACK PRESSURE / ANTI-SYPHON VALVE
C/W OPTIONAL PRIMING VALVE
PRESSURE
GAUGE
TYPICAL INSTALLATION
CALL 1 - 800 - GRIFFCO Bulletin # CAL7003-2011
1
2
Vista de página 0
1 2

Resumo do Conteúdo

Página 1 - GLASS CALIBRATION CYLINDERS

Griffco Valve Inc.6010 N.Bailey Ave, Ste 1BAmherst, NY 14226Phone: 1 800-474-3326Fax: 1 716-835-0893GLASS CALIBRATION CYLINDERSOperating Instructions: